| |
California
Hydrogen Business Council Member's Spotlight
Stuart Energy Systems, Inc.
Fleet Fuel Appliance
Phase III Project Summary
Stuart
P3 Fueler

"Fill'er Up With Hydrogen"
Stuart is building its Phase III Fleet Fuel Appliance,
which will be ready for testing and field deployment at the end of 1998. The P3-1
Prototype demonstrates a substantial reduction in footprint from both conventional
industrial hydrogen plants, a reduction of 80-90%, and previous Stuart Fuel Appliances
being about 1/3 the size of the Phase II Fleet Fuel Appliance at BC
Transit Vancouver.

P3-1 Fueler under construction
The P3 design is highly flexible and convenient to deploy
and can be sized to accommodate a wide range of production requirements without
substantially increasing the footprint, making it an ideal design for transit operating
authorities, bus developers and other hydrogen-fuel users. On-site electrolysis provides
the possibility of using renewable energy such as hydroelectric power to produce hydrogen
the "zero emission fuel supply for zero emission vehicles".
PHASE III FLEET FUEL
APPLIANCE |
| Specifications |
| Electrical |
|
|
|
| Water |
|
| Hydrogen |
|
| |
|
|
|
| Controls |
- Automatic control system with fault interface indication and plant
shutdown
|
| Filling Station Modules |
- Single skid totally enclosed (fits in ISO Container)
|
| Storage |
|
| Dispenser |
|
|
|
For Further Information: Stuart
Energy Systems Inc.,
122 The West Mall, Toronto, Ontario, Canada M9C 1 B9
Phone: (416) 621-9460 Fax: (416) 621-8976
E-Mail: info@stuartenergy.com
|